Following the introduction of the Renewable Heat Incentive (RHI) scheme in 2011 the biomass energy sector experienced a rapid expansion followed by a significant contraction as the scheme introduced changes over time. As a consequence not all boiler installations have been completed and set-up as well as they could have which could result in poor levels of performance and increased maintenance requirements.
Mercia Energy has the experience to evaluate existing boiler installations and where necessary provide services such boiler re-commissioning, boiler optimisation, and re-installation to improve the overall performance of your biomass boiler installation.